Reporting & performance

Know where the deployment stands — and where every crew was.

Meterworx turns the day's installs into live dashboards: productivity, route saturation, projected completion, and a GPS breadcrumb trail — so you can answer the utility before they ask.

Past the status table.

A grid of "assigned / completed" tells you a count, not a story. Meterworx shows installs per day and per crew, time-per-install, route saturation, and a projected finish date — the operational view a program manager actually needs to run the rollout.

  • Installs/day, time-per-install, crew averages
  • Route saturation + burn-down and ETA
  • GPS breadcrumb replay of each tech's day
  • Exception & skip reporting for follow-up

Answer before they ask

Share a live progress view with the utility so status meetings are a glance, not a fire drill.

Coach the crews

Per-tech productivity makes it obvious where to help — and where a route is heavier than it looked.

Forecast the finish

Burn-down and ETA turn "we're making progress" into a defensible completion date.

See Meterworx on your route.

A 20-minute walkthrough on a job that looks like yours — no slides.