Reporting & performance
Know where the deployment stands — and where every crew was.
Meterworx turns the day's installs into live dashboards: productivity, route saturation, projected completion, and a GPS breadcrumb trail — so you can answer the utility before they ask.
Past the status table.
A grid of "assigned / completed" tells you a count, not a story. Meterworx shows installs per day and per crew, time-per-install, route saturation, and a projected finish date — the operational view a program manager actually needs to run the rollout.
- Installs/day, time-per-install, crew averages
- Route saturation + burn-down and ETA
- GPS breadcrumb replay of each tech's day
- Exception & skip reporting for follow-up
Answer before they ask
Share a live progress view with the utility so status meetings are a glance, not a fire drill.
Coach the crews
Per-tech productivity makes it obvious where to help — and where a route is heavier than it looked.
Forecast the finish
Burn-down and ETA turn "we're making progress" into a defensible completion date.
See Meterworx on your route.
A 20-minute walkthrough on a job that looks like yours — no slides.